Reinforcement of the previously surveyed embankment and modification of the final covering of the S. Orsola landfill, Municipality of Spoleto (Perugia)

Reinforcement of the previously surveyed embankment and modification of the final covering of the S. Orsola landfill, Municipality of Spoleto (Perugia). Technical services in the form of topographic survey of the volumes of topsoil removal, excavation and tipping. Setting out the new hillside and the containment gabions. As-built survey of the works. Surface area of the work: 6,000 sq m. Calculated volumes: 37,000 cubic meters. Amount: 685.938.70 euros (2015-in progress).