Restructuring of the wards on the first floor of the south wing of the Misericordia Hospital Unit in Grosseto

Restructuring of the wards on the first floor of the south wing of the Misericordia di Grosseto Hospital Unit. Collaboration in architectural design and plant engineering. Amount: 450,000 euros (2011).

DATA: 2011

Article published on

16 October 2018

Interested in a quote?